Hello, I am Somang Yoon, Representative Administrative Agent at Insight Administrative Agency.
The project ending is not, on its own, a reason to send the worker straight to the next site. Power transmission electrician (76231) is an occupation that requires permission before the workplace is changed.
If the work in that section that required power transmission electricians has been completed, you can apply for a change of workplace to move the worker to the next work section, with a transfer consent form.
Power transmission projects are carried out section by section, so once the tower and line-stringing work in one section is finished, companies often want to move skilled workers to another site.
Site managers want to keep gaps in staffing short, but the procedure for moving a power transmission electrician to a new workplace differs from other E-7 occupations, where a report filed after the move is enough.
This article does not cover eligibility requirements or wage standards. It focuses on the procedure for moving workers after a project is completed.
Why Is Prior Permission Required Instead of a Report After the Move?
Article 21 of the Immigration Act requires prior permission to change or add a workplace. As an exception, it allows certain designated professionals to file a report within 15 days instead.
The Residence Services Manual by Status of Stay (as of September 18, 2026) classifies power transmission electrician (76231) as an occupation that needs permission to change or add a workplace, because it requires advance management, for example through limits on the number of workers allowed per employer.
As a result, the approach used for other E-7 occupations, where the worker starts at the new site first and the change is reported later, does not work for this occupation.
Plan the schedule so that the worker does not start at the new workplace until permission is granted.
When Is a Change of Workplace Allowed?
The Manual’s section on power transmission electricians sets out two cases in which a change of workplace to move to the next work section is allowed.
The first is when the foreign worker is not at fault, for example due to suspension or closure of business, worsening business conditions, or expiry of the employment contract.
The second is when the work in that section that required power transmission electricians has been completed. In this case, a transfer consent form is mandatory.
The wording that a transfer consent form is mandatory applies to the project-completion case. It should not be read broadly to mean that the same document is required in every case where the worker is not at fault.
What you need to prove depends on which case applies, so check separately which supporting documents fit your actual situation.
Is the New Company Reviewed Again?
When permission to change workplace is reviewed, the employer requirements and the number of workers allowed per company are examined again.
The review will check again whether the company responsible for the next work section is a construction company that won a power transmission contract from Korea Electric Power Corporation (KEPCO), and whether it is hiring within the allowed number of workers.
The list below is not the list of required documents set out in the Manual. It is an example of review materials that are usually checked in advance in practice.
- Materials showing that the work in the previous section was completed, or showing a reason for which the worker is not at fault
- In the project-completion case, a transfer consent form from the original employer
- The new company’s power transmission construction contract and electrical construction business registration certificate
- The new employment contract and the company’s current foreign worker employment status
Is It Fine to Move the Worker to Another Site of the Same Company?
The fact that the employer stays the same does not by itself mean that no separate procedure is ever needed.
Article 18 of the Immigration Act prohibits foreigners from working anywhere other than their designated workplace. First compare the workplace set out in the existing permission with what will change because of this move.
If anything will differ from what was permitted, it is safest to confirm the required procedure with the competent immigration office before the worker starts at the new site.
Companies that move workers between sites often should manage section-by-section contracts and staffing plans together from the outset.
Are There Reports the Company Must File Separately?
Under Article 19 of the Immigration Act and Article 24 of its Enforcement Decree, the employer must file a report within 15 days from the date it dismisses a foreign worker or the foreign worker leaves the job.
This employer report is a separate procedure from the permission to change workplace under Article 21. Completing one does not take care of the other.
Timing the previous company’s report and the new company’s permission application together helps reduce staffing gaps and missed procedures.
This matters especially when the employer changes, because the two companies should agree in advance on what each of them will handle.
Moving between work sections only works when the project’s progress, the existing permission, and the new company’s requirements all line up at once.
For this reason, the move needs a professional review under the immigration guidelines that looks at the worker’s duties, the site contract documents, and the existing permission together.
If you tell me when the project will be completed and which site the worker is scheduled to go to next, I will review your case personally and explain the procedure you need and the order in which to prepare.